CONNECTIONS
Railway /road connection and loading/unloading capacity
Three custom-built rail tracks connect Callatis Gas to the Romanian Railway system and facilitate the rapid maneuvering of railcars
A full train shipment (40 railcars) can be loaded in less than 24 hours
The railcar loading ramp supports the weighting/loading of 8 railcars simultaneously in approximately 4 hours (including positioning of cars and external maneuvers)
The railcar loading ramp has arms designed for railcars with loading valves at the bottom of the railcar
The auto-loading ramp for LPG tanks supports the simultaneus loading of two tanks (12 tones each) in 1 hour; the ramp has 1 pump with 60 m3/hour capacity